Fully automatic feeding system for boiler rooms with boiler room storage
A central vacuum cleaner transports the pellets from primary storage to boiler room where it lands in a 20 litre suction pot. When the level of the boiler room storage sinks the vacuum cleaner starts and fills the suction pot. When the suction pot is full the vacuum cleaner stops and the pellets are emptied in the boiler room storage. The process is repeated until the boiler room storage is full. From here a feeding screw feeds the pellets into the boiler.




